Uncategorized

Quilting and Bathroom Renovation

Not a lot of sewing or quilting is happening around here. But it will tonight. Because this is such a small place, it’s hard to set up the sewing machine when the renovation work is going on. Everything is full of dust. And I don’t want that dust in or on my sewing machine, WIP’s or fabrics.

I also contracted the flu from the flu shot, which is rare, but they say it can happen. I didn’t just get the symptoms, I got the fever, aches, stuffyness and cough. But I am getting on the other side of it, and am very happy about that.

Lots of progress in the bathroom. And everyone’s done for the day. Let’s see what I can get done.

Stay tuned.

I read all your comments and respond by e-mail.

Happy Quilting and Renovating!!

Previous Post Next Post

I love reading your comments, and will respond directly by e-mail.

2 Comments

  • Reply scottylover October 29, 2015 at 3:14 am

    Sorry to hear you got sick from the flu shot! Glad you are getting better. The bathroom is looking wonderful!

    Oh, and I checked my stash for the blue fabric and I don't have any. I thought I did but I must have used it for something,

    Sandy A

  • Reply Beth @ Cooking Up Quilts October 29, 2015 at 1:31 pm

    The bathroom looks great. I hope you get to do a little sewing, and hope you feel better soon!

  • Leave a Reply